Covering National, City, Corporate and Global Real Estate
Sindh Real Estate News and Land Insights
Real Estate & Land Insight
Explore the divisions of Sindh, a major province in Pakistan with strategic coastal regions,
agricultural zones, and rapidly growing urban real estate hubs.
Governs land revenue, territorial administration, and overall land management across
Sindh.
Sindh Land Records
Authority (SLRA)
Responsible for digitization, maintenance, and verification of rural land records in
Sindh.
Sindh Local Government
& Housing Town Planning Department
Oversees urban development, housing schemes, town planning, and municipal
governance.
Sindh Building Control
Authority (SBCA)
Regulates building approvals, construction standards, and urban compliance within
Sindh.
Important Updates from Sindh
Real Estate & Land News
Published: August 21, 2026 at 9:27 AM
Sukkur/Hyderabad, New Karachi /Hyderabad Motorways to Begin This Year
سکھر/حیدرآباد اور نئی کراچی/حیدرآباد موٹرویز پر تعمیراتی کام رواں سال شروع ہوگا
▫️Federal Communications Minister says construction will start from Sukkur in 2026, with the Sukkur/Hyderabad motorway targeted for completion within two years
▫️وفاقی وزیر مواصلات کے مطابق سکھر/حیدرآباد موٹروے پر کام 2026 میں سکھر کی جانب سے شروع کیا جائے گا، منصوبہ دو سال میں مکمل کرنے کا ہدف مقرر
Karachi | ReNews Pakistan Federal Minister for Communications Abdul Aleem Khan has announced that construction work on major new motorway...
Karachi | ReNews Pakistan Federal Minister for Communications Abdul Aleem Khan has announced that construction work on major new motorway links connecting Sukkur, Hyderabad and Karachi will begin this year, marking a significant expansion of Sindh’s road infrastructure. Speaking to reporters in Karachi, the minister said work on the long awaited Sukkur/Hyderabad motorway would commence from the Sukkur side in 2026. The government intends to complete the project within two years, providing a modern motorway connection between northern and southern Sindh. The Sukkur/Hyderabad section is particularly important because it represents a major missing link in Pakistan’s north/south motorway network. Its development is expected to improve connectivity between Sindh and other parts of the country while facilitating passenger travel, freight movement and commercial activity along one of Pakistan’s most important transport corridors. Abdul Aleem Khan also announced plans for a new motorway between Hyderabad and Karachi. He clarified that the proposed route would be a separate motorway and would not be connected with or treated as an extension of the existing M-9 Motorway linking the two cities. The minister described the planned motorway development as a major infrastructure initiative for the people of Sindh as well as the rest of Pakistan. The projects are expected to strengthen road connectivity between Karachi, Hyderabad and Sukkur while improving access to the national motorway network. The announcement came as the communications minister held discussions with representatives of the All Pakistan Goods Transporters Alliance regarding issues faced by the freight and logistics sector. Alongside motorway development, the federal government plans to improve facilities available to goods transporters. Abdul Aleem Khan said suitable land would be arranged for truck stands, while properly equipped rest areas would also be developed to provide essential facilities to drivers and transport workers travelling on major highways. Addressing complaints regarding traffic enforcement, the minister assured transporters that they would be protected against unjustified traffic challans. At the same time, he stressed that commercial vehicles must comply with officially prescribed axle-load limits. He urged goods transport operators to avoid overloading, noting that adherence to axle load regulations is essential for road safety as well as protecting highways and motorways from premature deterioration caused by excessive vehicle weight. The minister said the government was prepared to address all genuine concerns of the transport community but emphasised that commitments would only be made where they could realistically be implemented. The proposed motorway projects, particularly the Sukkur/Hyderabad section and the separate Karachi/Hyderabad route, could significantly strengthen Sindh’s transport network by creating faster road connections for passengers and freight while improving links between Karachi and the country’s wider motorway system.
کراچی | ری نیوز پاکستان وفاقی وزیر مواصلات عبدالعلیم خان نے اعلان کیا ہے کہ سکھر، حیدرآباد اور کراچی کو ملانے والے اہم نئے موٹروے منصوبوں پر تعمیراتی کام رواں سال شروع کر دیا جائے گا، جس سے سندھ کے سڑکوں کے نیٹ ورک میں نمایاں توسیع متوقع ہے۔ کراچی میں صحافیوں سے گفتگو کرتے ہوئے وفاقی وزیر نے کہا کہ سکھر/حیدرآباد موٹروے پر کام 2026 میں سکھر کی جانب سے شروع کیا جائے گا۔ حکومت نے منصوبے کو دو سال میں مکمل کرنے کا ہدف مقرر کیا ہے، جس کے بعد شمالی اور جنوبی سندھ کے درمیان جدید موٹروے رابطہ قائم ہو جائے گا۔ سکھر/حیدرآباد موٹروے کی اہمیت اس لیے بھی زیادہ ہے کہ یہ پاکستان کے شمال سے جنوب تک پھیلے موٹروے نیٹ ورک کی ایک اہم کڑی سمجھی جاتی ہے جو تاحال مکمل نہیں ہو سکی۔ منصوبے کی تکمیل سے سندھ کا ملک کے دیگر حصوں سے رابطہ بہتر ہونے کے ساتھ مسافروں، مال بردار گاڑیوں اور تجارتی سرگرمیوں کیلئے بھی سفر زیادہ تیز اور مؤثر ہونے کی توقع ہے۔ عبدالعلیم خان نے حیدرآباد اور کراچی کے درمیان ایک نئی موٹروے تعمیر کرنے کے منصوبے کا بھی اعلان کیا۔ انہوں نے واضح کیا کہ مجوزہ موٹروے موجودہ ایم-9 موٹروے سے الگ ہوگی اور اسے ایم-9 کی توسیع یا اس سے منسلک منصوبے کے طور پر تعمیر نہیں کیا جائے گا۔ وفاقی وزیر نے ان منصوبوں کو سندھ کے عوام کے ساتھ ساتھ پورے ملک کیلئے اہم انفراسٹرکچر منصوبے قرار دیتے ہوئے کہا کہ نئی موٹرویز سے کراچی، حیدرآباد اور سکھر کے درمیان مواصلاتی رابطہ مزید مضبوط ہوگا اور سندھ کو قومی موٹروے نیٹ ورک سے بہتر طور پر منسلک کرنے میں مدد ملے گی۔ یہ اعلان ایسے وقت میں سامنے آیا جب وفاقی وزیر مواصلات نے آل پاکستان گڈز ٹرانسپورٹرز الائنس کے نمائندوں سے ملاقات میں مال بردار ٹرانسپورٹ کے شعبے کو درپیش مسائل پر بھی تبادلہ خیال کیا۔ موٹروے منصوبوں کے ساتھ حکومت نے گڈز ٹرانسپورٹرز کیلئے سہولیات بہتر بنانے کا بھی فیصلہ کیا ہے۔ عبدالعلیم خان کے مطابق ٹرک اڈوں کیلئے مناسب جگہ فراہم کی جائے گی جبکہ اہم شاہراہوں پر جدید آرام گاہیں بھی تعمیر کی جائیں گی جہاں ڈرائیوروں اور ٹرانسپورٹ سے وابستہ افراد کو ضروری سہولیات دستیاب ہوں گی۔ ٹریفک قوانین کے نفاذ سے متعلق شکایات پر وفاقی وزیر نے یقین دہانی کرائی کہ ٹرانسپورٹرز کے خلاف بلاجواز چالان نہیں کیے جائیں گے۔ تاہم انہوں نے واضح کیا کہ کمرشل گاڑیوں کو مقررہ ایکسل لوڈ کی حد پر ہر صورت عمل کرنا ہوگا۔ انہوں نے گڈز ٹرانسپورٹرز پر زور دیا کہ وہ گاڑیوں میں مقررہ حد سے زیادہ وزن نہ لادیں کیونکہ ایکسل لوڈ قوانین پر عمل نہ صرف سڑکوں پر محفوظ سفر کیلئے ضروری ہے بلکہ اس سے شاہراہوں اور موٹرویز کو زائد وزن کے باعث قبل از وقت نقصان سے بھی بچایا جا سکتا ہے۔ وفاقی وزیر نے کہا کہ حکومت ٹرانسپورٹرز کے تمام جائز مطالبات حل کرنے کیلئے تیار ہے، تاہم صرف وہی وعدے کیے جائیں گے جن پر عملی طور پر مکمل عملدرآمد ممکن ہو۔ سکھر/حیدرآباد موٹروے اور الگ کراچی/حیدرآباد موٹروے کی تعمیر سے سندھ کے ٹرانسپورٹ نیٹ ورک میں نمایاں بہتری آنے کی توقع ہے، جس سے مسافروں اور مال بردار ٹریفک کیلئے سفر تیز ہوگا جبکہ کراچی کا ملک کے وسیع تر موٹروے نظام سے رابطہ بھی مزید مؤثر ہو سکے گا۔
Published: August 20, 2026 at 5:08 PM
Karachi Mayor Sets September 30 Deadline for Rs1 Billion Tori Bangash Road Project
کراچی کے ایک ارب روپے کے توری بنگش روڈ منصوبے کی تکمیل کیلئے 30 ستمبر کی ڈیڈ لائن مقرر
▫️Key alternative route will improve connectivity between District West, Orangi, Keamari and Hub River Road, with KMC directed to complete remaining development work within the stipulated timeframe
▫️اہم متبادل راستے سے ضلع غربی، اورنگی، کیماڑی اور حب ریور روڈ کے درمیان رابطہ بہتر ہو گا، کے ایم سی کو باقی ترقیاتی کام مقررہ مدت میں مکمل کرنے کی ہدایت
Karachi : ReNews PakistanKarachi Mayor Barrister Murtaza Wahab has set September 30, 2026, as the deadline for completing development work...
Karachi : ReNews Pakistan Karachi Mayor Barrister Murtaza Wahab has set September 30, 2026, as the deadline for completing development work on Tori Bangash Road, a major road infrastructure project estimated to cost around Rs 1 billion and aimed at improving connectivity across key western areas of the city. The mayor issued the deadline while inspecting ongoing construction work on Tori Bangash Road, where officials from the Karachi Metropolitan Corporation’s Engineering Department briefed him on the project's progress and remaining work. The road is being developed as an important alternative connection between District West, Orangi, Keamari and Hub River Road. Once completed, the route is expected to provide improved access for residents and commuters travelling between these areas. According to the mayor, the project will make daily travel easier for thousands of people living in surrounding localities and strengthen road connectivity in a part of Karachi where growing traffic volumes have increased pressure on the existing transport network. In addition to the road construction, a new stormwater drain is being developed alongside the route as a major component of the project. The drainage work is expected to be completed within the next few days, after which the remaining road construction will be accelerated to meet the September 30 deadline. The stormwater drain is intended to improve the disposal of rainwater and reduce drainage problems along the road during periods of heavy rainfall. Integrating drainage infrastructure with the road project is expected to help protect the newly developed carriageway from water accumulation and related deterioration. Wahab directed the relevant KMC departments and project teams to ensure that both the road and drainage components are completed within the stipulated timeframe so that the route can be made fully available to residents without further delay. The approximately Rs 1 billion investment reflects the scale of development work being undertaken on the corridor, including the road itself and associated municipal infrastructure. Once operational, Tori Bangash Road is expected to serve as an alternative route for traffic moving between Orangi and other parts of District West towards Keamari and Hub River Road, potentially distributing traffic more efficiently across the surrounding road network. The project is also significant because Hub River Road serves as an important transport corridor connecting Karachi with areas towards Hub and Balochistan. Improved feeder and alternative routes leading towards the corridor could therefore benefit both local and through traffic. The mayor said KMC is currently undertaking development projects across different parts of Karachi and intends to complete a number of ongoing schemes during the current year. He added that the municipal administration is focusing on improving roads, drainage systems and other basic urban facilities as part of its broader infrastructure development programme. With the September 30 deadline now set, the Engineering Department and other relevant agencies have been directed to expedite the remaining work on Tori Bangash Road, particularly the stormwater drain and unfinished road sections, to ensure the project is completed and opened for public use within the announced timeframe.
کراچی : ری نیوز پاکستان میئر کراچی بیرسٹر مرتضیٰ وہاب نے تقریباً ایک ارب روپے کی لاگت سے جاری توری بنگش روڈ منصوبے کی تکمیل کیلئے 30 ستمبر 2026 کی ڈیڈ لائن مقرر کر دی ہے۔ منصوبے کا مقصد شہر کے مغربی علاقوں میں سڑک رابطوں کو بہتر بنانا اور شہریوں کیلئے روزمرہ آمدورفت کو آسان بنانا ہے۔ میئر کراچی نے توری بنگش روڈ پر جاری تعمیراتی کام کا معائنہ کیا، جہاں کراچی میٹروپولیٹن کارپوریشن کے انجینئرنگ ڈیپارٹمنٹ کے حکام نے انہیں منصوبے کی پیش رفت اور باقی ماندہ کام سے متعلق بریفنگ دی۔ توری بنگش روڈ کو ضلع غربی، اورنگی، کیماڑی اور حب ریور روڈ کے درمیان ایک اہم متبادل رابطہ سڑک کے طور پر تیار کیا جا رہا ہے۔ منصوبہ مکمل ہونے کے بعد ان علاقوں کے رہائشیوں اور روزانہ سفر کرنے والے شہریوں کو بہتر رسائی میسر آئے گی۔ میئر کراچی کے مطابق یہ منصوبہ اطراف کی آبادیوں میں رہنے والے ہزاروں افراد کیلئے روزمرہ سفر آسان بنائے گا اور شہر کے اس حصے میں سڑکوں پر بڑھتے ہوئے ٹریفک دباؤ کو کم کرنے میں مدد دے گا۔ سڑک کی تعمیر کے ساتھ ساتھ منصوبے کے تحت ایک نیا برساتی نالہ بھی تعمیر کیا جا رہا ہے، جو اس منصوبے کا اہم حصہ ہے۔ نکاسی آب کا کام آئندہ چند روز میں مکمل کیے جانے کی توقع ہے، جس کے بعد باقی ماندہ سڑک کی تعمیر تیز کر دی جائے گی تاکہ منصوبہ 30 ستمبر کی مقررہ مدت تک مکمل کیا جا سکے۔ برساتی نالے کی تعمیر کا مقصد بارش کے پانی کے نکاس کو بہتر بنانا اور شدید بارشوں کے دوران سڑک پر پانی جمع ہونے کے مسائل کو کم کرنا ہے۔ سڑک کے ساتھ نکاسی آب کے مؤثر نظام کی تعمیر سے نئی شاہراہ کو پانی جمع ہونے اور اس کے نتیجے میں ہونے والے نقصان سے بھی محفوظ رکھنے میں مدد ملے گی۔ مرتضیٰ وہاب نے متعلقہ کے ایم سی محکموں اور منصوبے پر کام کرنے والی ٹیموں کو ہدایت کی کہ سڑک اور نکاسی آب دونوں کے کام مقررہ مدت میں مکمل کیے جائیں تاکہ شہری بلا تاخیر اس منصوبے سے فائدہ اٹھا سکیں۔ تقریباً ایک ارب روپے کی سرمایہ کاری میں مرکزی سڑک کی تعمیر کے ساتھ اس سے منسلک شہری بنیادی ڈھانچے کی بہتری بھی شامل ہے۔ منصوبہ مکمل ہونے کے بعد توری بنگش روڈ اورنگی اور ضلع غربی کے دیگر علاقوں سے کیماڑی اور حب ریور روڈ کی طرف جانے والی ٹریفک کیلئے ایک متبادل راستے کے طور پر کام کرے گی، جس سے اطراف کے سڑک نیٹ ورک پر ٹریفک کا دباؤ بہتر انداز میں تقسیم ہونے کی توقع ہے۔ یہ منصوبہ اس لحاظ سے بھی اہم ہے کہ حب ریور روڈ کراچی کو حب اور بلوچستان کی سمت جانے والے علاقوں سے ملانے والا ایک اہم ٹرانسپورٹ کوریڈور ہے۔ اس کوریڈور سے منسلک متبادل اور رابطہ سڑکوں کی بہتری سے مقامی اور بین الاضلاعی ٹریفک دونوں کو فائدہ پہنچ سکتا ہے۔ میئر کراچی نے کہا کہ کے ایم سی شہر کے مختلف علاقوں میں متعدد ترقیاتی منصوبوں پر کام کر رہی ہے اور رواں سال کے دوران کئی جاری سکیموں کو مکمل کرنے کا ہدف رکھا گیا ہے۔ انہوں نے کہا کہ شہری انتظامیہ سڑکوں، نکاسی آب کے نظام اور دیگر بنیادی شہری سہولتوں کو بہتر بنانے پر توجہ دے رہی ہے تاکہ کراچی کے انفراسٹرکچر میں مجموعی بہتری لائی جا سکے۔ 30 ستمبر کی ڈیڈ لائن مقرر کیے جانے کے بعد انجینئرنگ ڈیپارٹمنٹ اور دیگر متعلقہ اداروں کو توری بنگش روڈ کے باقی کام، بالخصوص برساتی نالے اور نامکمل سڑک حصوں کی تعمیر تیز کرنے کی ہدایت کر دی گئی ہے تاکہ منصوبے کو مقررہ مدت میں مکمل کرکے عوام کیلئے کھولا جا سکے۔
Published: August 20, 2026 at 3:01 PM
International Steels Plans Exit from Leading Construction and Design Firm Chenoy Engineering, Recommends Sale of 17% Stake for Rs 350 Million
انٹرنیشنل سٹیلز کا تعمیرات و ڈیزائننگ کی معروف کمپنی چنائے انجینئرنگ سے نکلنے کا فیصلہ، 17 فیصد شیئرز 35 کروڑ روپے میں فروخت کرنے کی سفارش
▫️Board proposes sale of 4.845 million shares at Rs 72.24 each; transaction requires shareholder approval at AGM on October 5 and necessary regulatory clearances
▫️کمپنی کا بورڈ 48 لاکھ 45 ہزار شیئرز 72.24 روپے فی شیئر کے حساب سے فروخت کرنا چاہتا ہے، حتمی منظوری 5 اکتوبر کو اے جی ایم میں شیئر ہولڈرز سے لی جائے گی
Karachi | ReNews PakistanInternational Steels Limited has recommended the sale of its entire 17% stake in Chinoy Engineering & Construction...
Karachi | ReNews Pakistan International Steels Limited has recommended the sale of its entire 17% stake in Chinoy Engineering & Construction (Pvt) Limited for Rs 350 million. According to material information submitted to the Pakistan Stock Exchange on August 20, ISL’s board recommended selling 4.845 million ordinary shares in CECL at Rs 72.24 per share. The proposed transaction has a total value of Rs350 million. The sale is not yet final and will require approval from International Steels’ shareholders at the company’s 19th Annual General Meeting, scheduled for October 5, 2026. The transaction will also remain subject to all necessary regulatory approvals. ISL said the formal notice for the Annual General Meeting would be issued in due course. Chinoy Engineering & Construction was established in 2024 as an associate venture of International Industries Limited, Pakistan Cables Limited and International Steels to pursue opportunities in the construction and engineering sectors. CECL operates in areas including design, construction, demolition and infrastructure development. International Steels is among Pakistan’s major flat steel manufacturers and produces cold rolled, galvanized and colour coated steel products for industrial and commercial use.
کراچی | ری نیوز پاکستان انٹرنیشنل سٹیلز لمیٹڈ نے چنائے انجینئرنگ اینڈ کنسٹرکشن پرائیویٹ لمیٹڈ میں اپنے تمام 17 فیصد شیئرز 35 کروڑ روپے میں فروخت کرنے کی سفارش کر دی ہے۔ پاکستان سٹاک ایکسچینج کو 20 اگست کو دی گئی اہم معلومات کے مطابق انٹرنیشنل سٹیلز کے بورڈ نے چنائے انجینئرنگ کے 48 لاکھ 45 ہزار عام شیئرز 72 روپے 24 پیسے فی شیئر کے حساب سے فروخت کرنے کی سفارش کی ہے۔ اس سودے کی مجموعی مالیت 35 کروڑ روپے بنتی ہے۔ تاہم شیئرز کی فروخت ابھی حتمی نہیں ہے۔ اس کیلئے انٹرنیشنل سٹیلز کے شیئر ہولڈرز کی منظوری ضروری ہوگی، جو کمپنی کی 19ویں سالانہ جنرل میٹنگ میں لی جائے گی۔ یہ اجلاس 5 اکتوبر 2026 کو ہوگا۔ مجوزہ فروخت متعلقہ سرکاری اور ریگولیٹری اداروں کی ضروری منظوریوں سے بھی مشروط ہوگی۔ کمپنی کے مطابق سالانہ جنرل میٹنگ کا باقاعدہ نوٹس بعد میں جاری کیا جائے گا۔ چنائے انجینئرنگ اینڈ کنسٹرکشن 2024 میں انٹرنیشنل انڈسٹریز لمیٹڈ، پاکستان کیبلز لمیٹڈ اور انٹرنیشنل سٹیلز کے مشترکہ کاروباری منصوبے کے طور پر قائم کی گئی تھی۔ کمپنی تعمیرات، ڈیزائن، عمارتیں گرانے اور بنیادی ڈھانچے کے منصوبوں سمیت مختلف انجینئرنگ شعبوں میں کام کرتی ہے۔ انٹرنیشنل سٹیلز پاکستان میں فلیٹ سٹیل بنانے والی بڑی کمپنیوں میں شامل ہے اور کولڈ رولڈ، گیلونائزڈ اور کلر کوٹڈ سٹیل مصنوعات تیار کرتی ہے۔